Companies with 2 to 10 subsidiaries needing consolidated financials, intercompany eliminations, and multi-currency reporting in NetSuite.
EDGE Pack
Every engagement produces these six layers. AI drafts; AMs review; buyers approve; the ledger captures evidence.
The agreed scope, in writing, before anyone configures anything.
How the ERP gets configured to deliver the BRD. AI-drafted, AM-reviewed.
What it costs in hours and time. Synchronized with the SDD; no scope drift.
The configuration assets and customizations that bring the design to life.
The step-by-step plan from build through go-live and hypercare.
The evidence pack. What was approved, when, by whom, against what value baseline.
Phase-by-phase deliverables included in this package.
Mandatory checkpoints before each phase can proceed. No exceptions.
Entity Structure Signoff
Exit criteria: All subsidiaries configured; roles assigned
Intercompany Pairing
Exit criteria: All IC AR/AP pairs reconciling to zero
Currency Revaluation Pass
Exit criteria: Revaluation results match manual calculation
Consolidation Accuracy
Exit criteria: Consolidated trial balance matches manual Excel within 0.5%
UAT Exit
Exit criteria: Finance controller signoff; all P1 cases passed
Project success depends on timely inputs from your team. These are required before or during delivery:
Dependencies: NetSuite OneWorld license · Finance lead per entity · Source trial balances per entity
Typical team for this package. All consultants are verified through our vetting process.
The factors that move this package price up or down from the base range.
All scope changes go through a formal change control process. We'll provide a written change order with the impact on timeline and cost before any out-of-scope work begins. This protects both parties and keeps the project predictable.
Data migration includes a three-stage process: extract and audit (we validate data quality before loading), test loads with reconciliation reports (we run multiple trials until results match your source system within tolerance), and production cutover with a rollback plan. We never go live without a reconciliation sign-off.
Hypercare is a dedicated support period (typically 30 days) immediately after go-live. It includes daily monitoring, priority triage for issues, user support, and a final knowledge transfer session. Your consultant remains available during hypercare at no additional cost.
Yes. Every package is designed as a modular foundation. Add-on scopes can be attached at any phase or after go-live through a separate SOW. We'll document recommended next steps in the hypercare report.
Standard structure is milestone-based: 30% at project kickoff, 30% at design signoff (QA Gate 1), 30% at UAT completion (QA Gate 4), and 10% at go-live. Alternative structures are available for large projects.